• We need your support!

    We are currently struggling to cover the operational costs of Xtremepapers, as a result we might have to shut this website down. Please donate if we have helped you and help make a difference in other students' lives!
    Click here to Donate Now (View Announcement)

Statistics P6 Help needed

Messages
98
Reaction score
86
Points
28
the answer is right......but can you plz explain it.....
thanx

Assume we have B1 B2 B3 B4 B5 and G1 G2 G3 (They are all different people, hence the numbering :p)

We want the boys to sit together. As a result we have to group them as a single entity.

Now we have B1B2B3B4B5 as a group.

In the group, there are 5! ways in which they can be arranged, whether B1 is first followed by B2, or B2 is first followed by B1 and so on.

It is time to put this group amongst the girls.

We can have an arrangement of:

G1 [the boys group] G2 G3

Or,

[the boys group] G1 G2 G3

Or,

G2 [the boys group] G1 G3

And so on.

You should now notice that we have 4 different items to "play" with, hence 4!

Therefore 4! * 5!
 
Messages
1,824
Reaction score
949
Points
123


i) P(20-12<X<20+12)
P(8<X<32)=0.94
P(-12/SD<X<12/SD)=0.94
2Phi(12/SD)-1=0.94
2Phi(12/SD)=1.94
Phi(12/SD)=0.97
12/SD=invPhi(0.97)

And take it from there in part i...

part ii use SD from part i..

P(X>13)
P(z>13-20/SD)
P(z>-7/SD)
P(z<7/SD)

use the table..

part iii..

find P(X>32)

then use that in binomial .. with p= above n = 7 ..

And Answer would be P(r>=2) = 1-P(0,1)

That should give you the answer...
 
Messages
98
Reaction score
86
Points
28
Can you guys help me with Q1(ii) nov09 v62?
Q3 = 63.

Since Q3 is the 75th percentile of data, the probability of anything below Q3 is 0.75

From previous question we know that X~N(51,sd)

Therefore P(X<63) = 0.75

z = 0.674

P(Z < (63-51)/sd = 0.674

12 = 0.674 * sd

sd = 12/0.674 =17.8 :)
 
Messages
1,824
Reaction score
949
Points
123
Q3 = 63.

Since Q3 is the 75th percentile of data, the probability of anything below Q3 is 0.75

From previous question we know that X~N(51,sd)

Therefore P(X<63) = 0.75

z = 0.674

P(Z < (63-51)/sd = 0.674

12 = 0.674 * sd

sd = 12/0.674 =17.8 :)

haha .. I think I did that with Q1.. since I remember using 0.25!
 
Messages
105
Reaction score
31
Points
28
Q3 = 63.

Since Q3 is the 75th percentile of data, the probability of anything below Q3 is 0.75

From previous question we know that X~N(51,sd)

Therefore P(X<63) = 0.75

z = 0.674

P(Z < (63-51)/sd = 0.674

12 = 0.674 * sd

sd = 12/0.674 =17.8 :)
Omg thanks a lot. Appreciate it so much. ❤
 
Messages
105
Reaction score
31
Points
28
Are you sure ON10 63 7 iv) ? I dont see why you need to find p or q there..? :eek:
Yeah :/ p(x<16) and it's a continuity correction question but it say visits lasting lesss than 8.2 and 8.2 is the mean. So we have to find a new mew and standard deviation but for that we need p and q how do i find it?
 
Messages
98
Reaction score
86
Points
28
Yeah :/ p(x<16) and it's a continuity correction question but it say visits lasting lesss than 8.2 and 8.2 is the mean. So we have to find a new mew and standard deviation but for that we need p and q how do i find it?

Since 8.2 mins is the mean, probability of a visit LESS than 8.2 mins = 0.5

From the question, we can say that X~B(35,0.5)
Therefore, X~N(17.5 , 8.75) since np = 35 * 0.5 = 17.5 and npq = 35 * 0.5 * 0.5 = 8.75 :)
P(X<16)
P(Z<= (15.5-17.5)/8.75^-0.5)

and so on :)
 
Messages
1,824
Reaction score
949
Points
123
Yeah :/ p(x<16) and it's a continuity correction question but it say visits lasting lesss than 8.2 and 8.2 is the mean. So we have to find a new mew and standard deviation but for that we need p and q how do i find it?

I think..

P(X<8.2)
P(z<8.2-8.2/SD) //SD from previous parts...
P(z<0)
p=0.5
q=0.5
n=35

Now use normal approximation

np= mean = 17.5 .. SD = √npq = √8.75

P(X<16)
P(X<15.5)
P(z<15.5-17.5/√8.75)
P(z<-0.6761)
1-Phi(0.6761)
P(X<16)=0.249 Answer
 
Messages
105
Reaction score
31
Points
28
Since 8.2 mins is the mean, probability of a visit LESS than 8.2 mins = 0.5

From the question, we can say that X~B(35,0.5)
Therefore, X~N(17.5 , 8.75) since np = 35 * 0.5 = 17.5 and npq = 35 * 0.5 * 0.5 = 8.75 :)
P(X<16)
P(Z<= (15.5-17.5)/8.75^-0.5)

and so on :)
But i don't get it why it's 0.5?
 
Messages
105
Reaction score
31
Points
28
I think..

P(X<8.2)
P(z<8.2-8.2/SD) //SD from previous parts...
P(z<0)
p=0.5
q=0.5
n=35

Now use normal approximation

np= mean = 17.5 .. SD = √npq = √8.75

P(X<16)
P(X<15.5)
P(z<15.5-17.5/√8.75)
P(z<-0.6761)
1-Phi(0.6761)
P(X<16)=0.249 Answer
I think..

P(X<8.2)
P(z<8.2-8.2/SD) //SD from previous parts...
P(z<0)
p=0.5
q=0.5
n=35

Now use normal approximation

np= mean = 17.5 .. SD = √npq = √8.75

P(X<16)
P(X<15.5)
P(z<15.5-17.5/√8.75)
P(z<-0.6761)
1-Phi(0.6761)
P(X<16)=0.249 Answer
I think..

P(X<8.2)
P(z<8.2-8.2/SD) //SD from previous parts...
P(z<0)
p=0.5
q=0.5
n=35

Now use normal approximation

np= mean = 17.5 .. SD = √npq = √8.75

P(X<16)
P(X<15.5)
P(z<15.5-17.5/√8.75)
P(z<-0.6761)
1-Phi(0.6761)
P(X<16)=0.249 Answer
Ohhhhh okay. Thanks a lot man was so confused in the 0.5 part. C:
 
Top